Not a member?     Existing members login below:

A Load Schedule for the Assembly Production of Specified Orders Relative to a Plant’s Capacity

TABLE OF CONTENTS
TASK 1: ___________________________________________________ 1
KEY WORDS: _____________________________________________________ 1
LOADING CASE SCENARIO ________________________________________ 3
METHODOLOGY __________________________________________________ 7
1. ANALYSIS AND EXPLODING VIEW OF FINAL ASSEMBLY _________ 8
2. DETERMINING THE REQUIRED QUANTITIES OF PARTS,
COMPONENTS AND RAW MATERIALS. CALCULATING
MANUFACTIRING/DELIVERY TIMES.___________________________ 10
2.1. CONDITIONAL ASSUMPTIONS _____________________________________10
2.2. CALCULATIONS AND ANALYSIS___________________________________10
2.3. RESULTS ________________________________________________________17
3. PRELIMINARY SCHEDULE _____________________________________ 19
3.1. IDENTIFICATION OF INITIAL SET OF LIMITATIONS __________________19
3.2. CRITICAL PATH ANALISYS ________________________________________20
3.3. DRAWING UP A PRELIMINARY SHEDULE ___________________________21
3.4. DETERMINING THE CRITICAL PATH COMPONENT___________________25
3.5. SUMMARY OF TIMES INCLUDED IN THE PRELIMINARY SCHEDULE___26
4. SCHEDULE OPTIMISATION ____________________________________ 27
5. CONCLUSIONS ________________________________________________ 29
TASK 2: __________________________________________________ 31
1. DETERMINING HIGH-RISK AREAS _____________________________ 31
2. RISK REDUCTION MEASURES__________________________________ 33
3. CONCLUSIONS ________________________________________________ 34
Remove